T3: Sustainable office in timber-hybrid construction
Represented by STRABAG BRVZ GmbH & Co. KG
Corporate Real Estate Management
Sustainable to the power of three
Timber-hybrid construction: Where sustainability takes shape
As digital as it gets
The implementation of BIM2FM laid the foundations early on for efficient building operations – relevant data is made available to facility management in digital form. The design also created the conditions for a flexible spatial layout and modern working environments based on the ‘New Work’ principle.
In addition to its environmental and technical qualities, the T³ represents a new way of working and provides space for 128 employees.
Designed and built with an integrated approach
The T3 combines functional requirements, environmental responsibility and the creation of high-quality working environments within a thoroughly thought-out overall concept. From the early ‘sustainability creative phase’ through to integrated design and construction site management, Zentrale Technik played a key role at every stage.
As the General Design Contractor, Zentrale Technik coordinated the specialist designers and ensured that the project’s ambitious goals – both technical and environmental – were successfully achieved.
Services
-
Design and construction from a single entity
- Sustainability Creative Phase
- Feasibility studies
-
General Design Contractor
- Integrated design
- Interdisciplinary design coordination
-
Engineering services according to HOAI
- Service Phase 1: Preliminary Study
- Service Phase 2: Preliminary Design
- Service Phase 3: Conceptual Design
- Service Phase 4: Design for Planning Approval
- Service Phase 5: Execution Design
- Service Phase 8: Construction Supervision
- Service Phase 9: Property Management
-
Sustainable Engineering
- Creative Phase Sustainability
- Structural engineering
- Building services engineering
- Facade engineering
- Outdoor facilities engineering
- Sustainability workshops
- EU Taxonomy
- Sustainable construction site certification
-
Smart Engineering
- BIM management
- Consistent model-based processing across all service phases
- Pilot project: plant identification system/thermodynamic building simulation
- Daylight simulation
- Model-based CO2 calculation